My Cabinet Refinishing Process

Here's exactly how I turn your kitchen cabinets around — start to finish, in about 10 days.

1. Consultation.
I walk your kitchen with you, talk color and hardware, and lock in your build slot.

2. Door & Drawer Removal.
On day one, I remove and number every door and drawer front, bag the hardware, and transport everything to my shop in Chatham.

3. Cleaning & Sanding.
Every piece is degreased, sanded, and repaired so the finish goes on smooth and lasts.

4. Priming.
I apply a professional bonding primer suited to your cabinet material — the key to a finish that won't chip or peel.

5. Spray Finishing.
Each door and drawer front gets a smooth, sprayed-on finish coat — no brush marks, no roller texture.

6. Onsite Box Prep & Paint.
While your doors cure in the shop, I prep, prime, and paint your cabinet boxes right in your kitchen. No emptying your cabinets! Continue using your kitchen!

7. Reinstallation.
Once everything's cured, I bring your doors and drawers back, reinstall them, and walk the finished kitchen with you.

I work every project start to finish with no overlapping jobs, so your kitchen gets my full attention from day one to day ten.